Mobile
Log In Sign Up
Home > english-chinese > "surrounding rock classification" in Chinese

Chinese translation for "surrounding rock classification"

围岩分类

Related Translations:
surrounding:  n.〔pl.〕周围的事物[情形],环境;附近。 picturesque surroundings 画一样美丽的环境。 social surroundings 社会环境。adj.包围着的;周围的。 the surrounding country 附近,近郊。
surrounded:  被围绕的1当他登陆时围住的,被围绕的
surround:  vt.围住,围绕,环绕;【军事】包围。 be surrounded with [by] 被…环绕着。n.外围物;铺在地毯周围的东西;围猎。 surround-sound 〔英国〕包围声〔具有包围收听者效果的一种高保真度放声〕。
surrounding atmosphere:  周围的大气周围空气
surrounding medium:  周围介质
diffused surround:  漫射晕
front surround:  前置式音场环绕技术
surrounding nets:  围网类
surrounding echo:  周围回声
surround illumination:  环绕照明
Example Sentences:
1.The idealized mode distinguishing method in surrounding rock classification
围岩分类中的理想模式识别方法
2.Fuzzy judgment advanced model and its application for surrounding rocks classification in tunnels
隧道围岩分类模糊评判改进模型及应用
3.( 3 ) a set of classified scheme is established , and surrounding rock classification fast estimate system based on fuzzy inference is developed , which open a new way for estimating classification of surrounding rock
( 3 )制定了一套适用于鹧鸪山隧道施工阶段的围岩分类方案,并研制了基于模糊逻辑推理的围岩类别快速判定系统,为围岩类别判定开辟了一条新的途径。
4.Furthermore tunnel structure commonly is designed by analogy method . on design , often , normally in view of safe consideration , adopt the method that reduction surrounds rock classification and uses fussy construction technology . so as soon as coming , engineering investment is certainly increased and construction project time is prolonged
且隧道结构一般按类比法设计,出于安全考虑,设计上一般采用降低围岩类别,使用复杂的施工工艺来提高施工的安全性,这样无形中增加了工程投资费用且延长了施工工期。
5.( 2 ) taking the geology analysis as main way and combining the pre - test , predicating the tunnel ' s main geology condition ( rock quality , surrounding rock classification , long - wide joint , fault , ground water , crustal stress ) , and predicating the main potential disaster ( collapse , breaking water , rockburst , large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field , finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot , and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel
通过地质分析、类比分析、监控量测、数值模拟、神经网络等方法,对鹧鸪山隧道潜在的主要地质灾害(塌方、涌水、岩爆和大变形)进行了预测预报( 3 )在现场地应力测试成果的基础上,运用数值计算进行应力场反演,基本查明了沿隧道轴线剖面的地应力分布规律:地应力量级在最大埋深附近达到最大值24mpa ,并预测k2 + 260 k3 + 000段将很可能成为鹧鸪山隧道的高地应力段。 ( 4 )塌方往往与断层破碎带及千枚岩相联系。
Similar Words:
"surrounding nets" Chinese translation, "surrounding obstacles" Chinese translation, "surrounding procedure" Chinese translation, "surrounding region" Chinese translation, "surrounding rock" Chinese translation, "surrounding rock consolidation" Chinese translation, "surrounding rock deformation" Chinese translation, "surrounding rock failure" Chinese translation, "surrounding rock pressure" Chinese translation, "surrounding rock stability" Chinese translation